Installed BESS capacity in Spain grew by 589% since 2025 blackout

Installed BESS capacity in Spain grew by 589% since 2025 blackout

Some of the consequences of the blackout include a 589% increase in installed BESS capacity in Spain between April 2025 and April 2026 (Lire plus…)

Vous lisez LMC.today gratuitement. Ce travail de veille, de tri, d’analyse et de mise en cohérence existe grâce aux soutiens. Le soutien au projet ne coûte que quelques centimes par mois.

Short link : https://lmc.today/921y